Estimation of Standard Time in Production of Light Weight Brick Manufacturing Using Ball Mill

Keywords:

Time Cycle, Normal, Standard

Abstract

One of the efforts that must be undertaken by companies in the field of production is the production process should be designed as efficiently and effectively as possible. For that in the implementation of the production process of the need for planning and monitoring good production so lightweight brick production process can run well, so that later can increase the number of qualified products. The aim of research analyzing the quality standard time lightweight brick production process, method of data collection directly to the worker / operator in the process I Ball Mill and Raw Material. The research result analysis cycle time, normal time and standard time, then the part I. Process Ball Mill and Raw Material 1 operator obtained a standard time 67.86 minutes, Operator 2 is obtained standard time standard time acquired 36.20 minutes , Operator 3 is a standard time 56.95 minutes. Standard time or standard time gained to the three operators in the process I. Ball Mill and Raw Materials takes one time settlement activities in the amount of 161.01 minutes.

Downloads

How to Cite

Estimation of Standard Time in Production of Light Weight Brick Manufacturing Using Ball Mill. (2020). International Journal of Advances in Scientific Research and Engineering (IJASRE), ISSN:2454-8006, DOI: 10.31695/IJASRE, 2(1), 16–22. Retrieved from https://ijasre.net/index.php/ijasre/article/view/16